Marching Virginians Center
Marching Virginians Center

The Marching Virginians Center includes a lighted artificial turf practice field, a storage building, and an open air pavilion.

The 4,300-square-foot building offers space for instrument storage and percussion practice, and an attached, 7,000-square-foot pavilion provides covered space for the full band to practice, rain or shine.

Previously, the Marching Virginians stored instruments in the lower level of the baseball team's batting cage facility and rehearsed on the infield of the Johnson-Miller Track Complex.

Building History

Construction on the $4.75 million facility started in 2014, and it opened in fall 2015.

Map Grid:

Building Number: 0198

Originally Built: 2015

Abbreviation: MARCH

Latitude:

Longitude: